Product Detail :
|
Podanur-shoranur section (bg) ctr (p) 20.785 km with new 60 kg 90 uts rails as lwr on psc sleeper 1660 nos/km with elastic fastenings at km 487.200-492.000,541.015- 545.000 & 549.000-551.000 on down line and km 522.000-530.000 & 531.200-533.200 on up line (19.785 km by trt and 1.000 km by manual laying.
|